Headers · 2025
Four-Header Container Program - 20 Loads in the 2025 Peak Season
In 2025 Meridian Freight ran a four-header container program: four John Deere 930F Flex headers were prepared in about two days, and about 20 containers went out in the peak period, each carrying about 12 metric tons. The program moved through New York to Klaipeda, where Meridian's responsibility ended; the dealer arranged the final transport to Kazakhstan.
| Equipment | John Deere 930F Flex headers |
|---|---|
| Route | Meridian facility – Chicago – New York – Klaipeda |
| Year | 2025 |
| Weight | About 12 metric tons per container |
| What Meridian did | Prepared and loaded four headers per container; about 20 containers dispatched in the peak period |


The shipment
Four employees prepared four John Deere 930F Flex headers over approximately two days. Once the dismantled units were staged in loading order, placing and securing all four in a container took about 30 minutes. Approximately 20 containers were dispatched during the peak period. Each carried about 12 metric tons of equipment. Containers were rotated continuously through the warehouse so the next set of prepared headers could be loaded without interrupting the packing line. The pictured program moved through New York to Klaipeda, where Meridian's responsibility ended. The dealer transferred the headers to Eurotrucks for final transportation to Kazakhstan. No unresolved complaint remained from the program.
From Meridian Freight's project archive. Published · Updated