Land levelers · 2019
Reynolds LSE 14 Land Leveler - Oversized Open Top Solution
In 2019 Meridian Freight sourced and purchased a Reynolds LSE 14 land leveler in Oklahoma. Its principal frame would not fit a standard closed container and cutting it was rejected, so Meridian located a 20-ft Open Top container and arranged crane loading in Houston. The shipment reached Novorossiysk without reported delay, damage or route change.
| Equipment | Reynolds LSE 14 land leveler |
|---|---|
| Route | Oklahoma – Houston – Novorossiysk |
| Year | 2019 |
| Container | 20-ft Open Top container |
| What Meridian did | Located a 20-ft Open Top container and arranged crane loading in Houston |


The shipment
This follow-on project began approximately three months after the preceding land-leveler shipment for the same customer. Meridian sourced and purchased the Reynolds LSE 14 in Oklahoma after the farmer recognized the economic and operating value of obtaining specialized U.S. land-leveling equipment. The principal frame would not fit inside a standard closed container. A Flat Rack or MAFI shipment was available, and cutting the frame for later welding was also considered. Meridian rejected the cutting option because the strength and alignment of the restored welds could not be assured as confidently as retaining the original frame. Meridian located a comparatively uncommon 20-ft Open Top container supplied by Hapag-Lloyd and arranged crane loading in Houston. The upper part of the leveler extended approximately 5 ft, or 1.5 m, above the open roof. Compared with the Flat Rack or MAFI alternatives, the Open Top plan produced estimated gross savings of approximately $4,000-$5,000. For the Oklahoma-to-Houston road leg, Meridian matched the load with a licensed carrier returning toward its home market near Houston. The carrier's operating authority and the driver's commercial credentials were checked before dispatch. Using this available backhaul capacity saved an additional estimated $1,500-$2,000 compared with sending a dedicated local truck from Houston. Combined estimated gross savings were therefore approximately $5,500-$7,000. The shipment reached Novorossiysk without reported delay, damage or route change, and Meridian's responsibility ended at the port.
From Meridian Freight's project archive. Published