Excavation and mining · 2026

Vermeer T1255 Cutter Attachment - Port Hueneme Ro-Ro

In 2026 Meridian Freight handled a second shipment of an identical Vermeer T1255 cutter attachment from Iowa to Port Hueneme for Ro-Ro movement to Shanghai. The 117,000-pound attachment needed oversized and overweight permits and a terminal lift plan. In 2026 it was transferred to a MAFI platform at Port Hueneme under the approved plan.

In progress
Vermeer T1255 Cutter Attachment - Port Hueneme Ro-Ro
EquipmentVermeer T1255 cutter attachment
RouteVermeer factory – Port Hueneme – Shanghai
Year2026
ContainerRo-Ro
Weight117,000 pounds
What Meridian didObtained the manufacturer’s lifting data, coordinated the port engineering review and reserved a suitable crane
Vermeer attachment hanging from a crane above a lowboy trailer on a port quay, with a ship behind
Vermeer attachment, black with yellow panels, lifted by a crane above a multi-axle lowboy trailer on a port quay; a vessel and port cranes stand behind.
Long multi-axle lowboy trailer with a Vermeer attachment, pulled by a white truck on a paved road
A white tractor unit pulls an extended multi-axle lowboy trailer that carries the yellow and black Vermeer attachment along a paved road.

The shipment

Meridian handled a second 2026 shipment of an identical Vermeer T1255 cutter attachment from Iowa to Port Hueneme for Ro-Ro movement to Shanghai. The 117,000-pound attachment required oversized and overweight permits and a terminal lift plan. Meridian obtained the manufacturer’s lifting data, coordinated the port engineering review and reserved a suitable crane. In early September 2026 the attachment was transferred to a MAFI platform at Port Hueneme under the approved plan.