- Home
- Destinations
- UAE
- Heavy equipment import
Used heavy equipment from the USA · UAE
Import heavy equipment from the USA to the UAE
If you want to import used machinery from the USA to the United Arab Emirates, you need a unit that has been checked before you pay and a sailing booked to Jebel Ali, the main gateway on the Gulf. We are the exporter, with no stock of our own: excavators, loaders and dozers are verified at origin before purchase, then shipped with the export papers complete.
- Excavators, loaders, dozers and graders found across the US dealer and auction network
- Hours, undercarriage, completeness and true measurements checked before purchase
- Flat rack, open-top or container to Jebel Ali, by weight and dimensions
- Mainland or free-zone entry, filed by your licensed UAE broker
- One WhatsApp thread, in English or Arabic, for the whole move
The US side is ours: sourcing, origin verification, export paperwork and the sea leg. The UAE customs entry, with its classification, duty and VAT, is your licensed UAE broker's.
Process
How we handle the shipment
Start from the tape measure: confirm the machine, verify it at origin, then fit it to flat-rack, open-top or container space on the Jebel Ali sailing.
Machine and measurements
Send a listing or spec sheet and, if you have them, weight and dimensions. For an excavator, loader, dozer or grader the numbers say more than the model name.
Verification at origin
Hours, undercarriage wear and completeness are checked on the spot before money changes hands, and oversize units are measured for the load plan on the same visit.
Open-top, flat rack or container
True weight, true dimensions and any dismantling decide the format, and the Jebel Ali booking is made to match.
Entry in the UAE
Mainland or free zone first: your licensed UAE broker advises the route, files the entry and clears the machine at Jebel Ali using the export set prepared at origin.
Scope
What the quote covers and what it doesn't
We separate the international leg we control from the local costs and formalities your customs broker confirms.
| Meridian coordinates | Your customs broker confirms at destination |
|---|---|
| Meridian coordinatesShortlisting used machines from US dealers and auctions | Your customs broker confirms at destinationThe landed cost, which waits for a UAE broker to confirm the tariff line for your machine |
| Meridian coordinatesPre-purchase verification of that machine at origin | Your customs broker confirms at destinationWhich entry route to use, free zone or mainland, a point your broker advises for each shipment |
| Meridian coordinatesExport documents, plus oversize and heavy-lift handling at origin | Your customs broker confirms at destinationLodging and clearing the customs entry, plus duty, VAT and conformity charges, all in the UAE |
| Meridian coordinatesSpace booked to Jebel Ali, with the documents shared with the UAE broker you name | Your customs broker confirms at destinationTrucking beyond Jebel Ali and whatever on-arrival inspection finds |
Quote
What we need to prepare a useful quote
True weight and dimensions let us price the Jebel Ali leg and the load format without padding for unknowns.
- Link to the listing, or the machine's make, model and year
- Weight and dimensions (length, width, height), if known
- Engine hours and condition, where known
- UAE destination (Dubai, Abu Dhabi, Sharjah or elsewhere) and timing
- Whether a UAE broker is already engaged on your side
- Intended use (site work, fleet expansion, resale), so our advice fits
Request a quote
Share the machine and the destination; we send back the scope of the international leg in writing.
Local compliance
Duty, VAT and entry route on the UAE side
Our scope ends at the point where the UAE tariff starts. The exact tariff line for your particular machine is for a licensed UAE customs broker to confirm before you commit funds. The rates in play are 5% customs duty on most machinery and 5% VAT on top, and used machinery imports are routine. A route through the Jebel Ali Free Zone can defer the duty until the machine clears into the mainland, and your broker says which route fits. Where a machinery category is regulated, the Ministry of Industry & Advanced Technology (MOIAT) sets the conformity requirements, which are confirmed before shipment.
Since 2013, Meridian has completed about 1,000 export projects.
FAQ
Frequently asked questions
What buyers ask us most before they ship.
Official sources
Official sources to validate your import
Requirements can change and depend on the classification, condition and use of the machine. Confirm your case with your importer or customs broker before you buy or ship.
Related resources
Keep exploring
Machine measured, verified and booked to Jebel Ali
Send the model and its measurements. We verify the unit at origin and book the right deck to Jebel Ali, with export documents ready for your broker.