Combines
John Deere S670 Combine — Port Staging
A John Deere S670 combine waited at a port yard in Savannah, GA, for placement on a flat rack, with a port forklift ready for final positioning before lashing. The 14,000 kg combine shipped to Odesa on a Hapag-Lloyd 40ft flat rack and arrived in 36 days with zero transport damage.
| Equipment | John Deere S670 combine |
|---|---|
| Route | Savannah – Odesa |
| Container | 40ft Flat Rack |
| Weight | 14,000 kg |
| Transit | 36 days |

The shipment
A John Deere S670 combine sits at the port yard in Savannah, GA awaiting flat rack placement. A port forklift stands ready for final positioning before lashing. The combine shipped to Odesa on a Hapag-Lloyd flat rack and arrived in 36 days with zero transport damage.
From Meridian Freight's project archive. Published
Have a similar shipment to plan?
Tell us the equipment and destination — we'll quote our part of the move.